To obtain access to full text of journal and articles you must register!
- Article name
- FORMALIZED APPROACH TO FORECASTING THE TIME AND COST OF THE DEVELOPMENT OF MILITARY TECHNICAL SYSTEMS
- Authors
- Shcheglov D. K., , _dk@bk.ru; d.shcheglv@kbsm.su, JSC "Design Bureau of Special Mechanical Engineering"; FSBEI of HE "Baltic State Technical University "VOENMECH" D. F. Ustinova", St. Petersburg, Russia
Saybel A. G., , saybel_ag@mail.ru, JSC "North-West regional center of Concern VKO "Almaz-Antey" - Obukhovsky zavod", St. Petersburg, Russia
- Keywords
- forecasting / approach / development / terms / cost / military-technical system / analogy method / prototype
- Year
- 2022 Issue 3 Pages 33 - 44
- Code EDN
- UOFAMZ
- Code DOI
- 10.52190/1729-6552_2022_3_33
- Abstract
- A formalized approach to the formation of a predictive estimate of the timing and cost of developing military-technical systems based on the method of analogies and prototypes is described. A feature of the approach is the ability to determine the balance between the required number of engineering and technical workers and the acceptable time for system development.
- Text
- BUY for read the full text of article
- Buy
- 500.00 rub